Central Plains Water
Current location in the site
Minute 12 Released 20th November 2009 [PDF 1MB]
Interim decision released by commissioners on Friday 30 October 2009 [PDF 266kb]
The original Central Plains Water scheme was a proposal to build a water storage dam in the Whitecliffs-Glentunnel area that would draw water from the Rakaia and Waimakariri rivers and release it to dry-land farms through a network of canals.
The application has now been modified:
- Central Plains Water Annexure C & D [PDF 7.5 MB]
- Withdrawal of Requirement Notice [PDF 24.9kb]
or broken down into smaller files for easy downloading:
- CPW Annexure Part 1[PDF 634kb]
- CPW Annexure Part 2 [PDF 2.3 MB]
- CPW Annexure Part 3 [PDF 2.8 MB]
- CPW Annexure Part 4 [PDF 2.0 MB]
These letters have been sent out to affected parties:
- Notice of withdrawal of Designation [PDF 22.8kb]
- Notice of Partial Withdrawal of Designation [PDF 23.0kb]
- Notice of Previous Withdrawal of Designation [PDF 22.1kb]
This has been a long process. For further information:
- background information
- Central Plains Water Ltd www.cpwl.co.nz
- Central Plains Water Trust www.cpw.org.nz
NOTE
Please be aware that this information is historical and that there have been changes and adjustments along the way.
Applications for land and water use were made to the Selwyn District Council and Environment Canterbury (ECan) in 2006.
Further information can be obtained by contacting the Duty Planner or e-mail planninginfo@selwyn.govt.nz