Accessibility quick skip links

Draft Walking and Cycling Strategy and Action Plan

Current location in the site

As part of the Long-Term Plan 2018-2028, the Council is seeking community feedback on the Draft Walking and Cycling Strategy and Action Plan and the proposed programme of projects and improvements.

The Draft 2018 Walking and Cycling Strategy and Action Plan is an update to the current Strategy adopted in 2009. It aims to improve walk/cycle networks within and between townships, and also proposes increased funding for annual township footpath extensions throughout the district and for major cycleway projects.

A total of seven major new cycleways, along with other improvements, are proposed over the 10-year period. Other projects are to coordinate with Christchurch Southern Motorway Stage 2 and to provide connections with main cycleway networks.


Download a copy of the Draft 2018 Walking and Cycling Strategy / Draft 2018 Walking and Cycling Strategy Action Plan

Footer navigation list

© Selwyn District Council | www.govt.nz