Road and Transport
| Non-Excavation CAR and TMP | $106 |
| Small Excavation CAR and TMP | $428 |
| Large Excavation CAR and TMP | $857 |
| Project CAR | Time and Costs |
| Events Community and Sporting CAR and TMP | No Charge |
| PARS (Pre Approved Reusable Scheme) CAR and TMP Repetitive Mobile Actions | $212 |
| Global CAR Non-Excavation and PARS (Pre Approved Reusable Scheme) TMP | $2,010 |
| Global CAR Excavation and PARS TMP | $2,010 |
| Road Space bookings (Relating to Global CAR) | $59 |
| Non-Conforming/Dangerous Audit Inspection & Review | $1,073 |
| Additional Site Inspections (per Inspection) | $857 |
| CAR and TMP Extension | $106 |
| Road Closure Application (in addition to CAR & TMP Fee) | $2,010 |
| Manager, Team Leader, Senior Engineer | $222 |
| Vehicle crossing application and inspection fee (Residential/Rural) | $190 |
| Vehicle crossing application and inspection fee (Commercial/Heavy Duty) | $380 |
| Non-Compliant Vehicle Crossing inspection fee | $159 |
| Tree removal and replacement for road access (including the purchase of two 45L specimen replacement trees, planting and staked with aftercare maintenance). | Starting from $1,000 (cost recovery). Final fee determined following site specific arboricultural assessment. Final charges will be confirmed after assessment. |
Large excavation
Anything over three Lin/M in any direction and completed in fewer than 10 working days. The fee includes processing a site walk over at the beginning of the project and a site inspection on completion/reinstatement. If required, additional inspections to be charged.
Project
Works exceeding 10 working days in duration and all subdivisions. To be assessed on application due to varying length of projects and varying inspection requirements.
Road closure
When a road is closed for any length of time for works. Fee includes processing of TMP and CAR, notification to the public and a site inspection at start and completion of works.
Excavation global CAR
Works including excavations i.e. for maintenance contractors and utility operators only. Fees include processing of the TMP and CAR, processing of all RSBs and inspection of five sites. Additional inspections carried out at a rate of $160 per hour.
Generic TMP
TMPs set up for small minor works to be used by TM providers and other approved contractors in place of site specific TMPs or for contractors with multiple repetitive works i.e. driveway contractors. Processing of TMP included in fee. Additional fees apply as per requested CAR type.