Swim lessons at the Selwyn Aquatic Centre
Kids at Picnic in the Park
Search the Selwyn DC website
Please read the Specific Conditions of the Vehicle Crossing Information Pack before making the application.
Please provide as much information as possible.
Your permit is valid for 12 months with your vehicle crossing to be completed within that period.
It is the property owner's responsibility to arrange and pay for the construction of a vehicle crossing.
The vehicle crossing must be formed to top course stage prior to the commencement of any building work.
Fee (as at 1 November 2017) $150.00 (incl. GST) An invoice will be emailed to the billing addressRetrospective applications $200.00 (incl. GST)Please note: As at 1 January 2023 this fee will increase to $160 & $210 retrospectively.
Please upload a sketch of the location, width of vehicle crossing and distances to the nearest vehicle crossings on the same side of the road. If more relevant (eg when adjacent vehicle crossings have yet to be formed) please show distance to neighbouring boundaries / nearest intersection if by corner.