There are three partner levels:

  • Bronze
  • Silver
  • Gold

All partners get:

  • Faster processing (within 10 working days).
  • Discounts on remote inspections.
  • A dedicated Council contact.
  • Regular checks (design) – 1 in 10 applications.

As you move up levels, you can:

  • Apply for more complex projects.
  • Get bigger fee discounts.

Design partners

Design partners can apply submit building consent applications that match their partner level. Each level allows you to apply for specific types of projects, as show in the table below.

 Usual consent processBronze partnerSilver partnerGold partner
Design scope Any application type
  • Solid fuel heater
  • Outbuilding
  • R2 with risk score up to 6
  • Non-habitable industrial building (eg  dairy shed, herd barn, etc)
  • Non-habitable Ancillary building work (eg bridge, retaining wall, stock underpass, outdoor fireplace, plinth, tank, etc)

  • Solid fuel heater
  • Outbuilding
  • R2 single storey with risk score up to 12
  • Specific engineering design^^
  • Pre land use resource consent*^
  • Pre 224**
  • Non-habitable industrial building (eg  dairy shed, herd barn, etc)
  • Non-habitable ancillary building work (eg bridge, retaining wall, stock underpass, outdoor fireplace, plinth, tank, etc)

  • Solid fuel heater
  • Outbuilding
  • All single storey R2
  • R3 single storey
  • Single level multi-unit dwelling
  • Specific engineering design
  • Pre land use resource consent*^
  • Pre 224**
  • Non-habitable industrial building (eg  dairy shed, herd barn, etc)
  • Non-habitable ancillary building work (eg bridge, retaining wall, stock underpass, outdoor fireplace, plinth, tank, etc)

Consent costs Time and cost to process

25% discount on usual processing fees

50% discount on usual processing fees

50% discount on usual processing fees
Plus fixed rate for R1 and R2 projects

^^Up to three SED items which include (waffle slab, truss, lintel design)

*^Not subdivision resource consent.

**PPP partners applying to build prior to s224 will need:

  • land use consent approval to build, and

have a pre application meeting to discuss planning conditions, one of which will be the requirement that a BLC be provided.

Construction partners

Construction partners can request remote inspections certain stages (R1 to R3 complexity buildings only):

  • Half high
  • Shelf-angle/brick lintel
  • Pre-plaster
  • Internal membrane
  • Drainage
  • Wastepipe/underslab
  • Site scrape
  • Pre-pour
  • Floor slab
  • Pre-line plumbing

Important: Floor slab and site scrape can only be done remotely if ground bearing and siting are confirmed.

Remote inspection costs

 Usual consent processBronze partnerSilver partnerGold partner
Remote inspection costs Time and cost 10% discount on inspection fee

15% discount on inspection fee

15% discount on inspection fee

How the partner levels work

  • Everyone starts at Bronze level.
  • You must stay at each level for at least 1 year.
  • You need to apply to move to the next level.
  • You must show good, consistent performance.

We regularly check how you’re tracking by:

  • Ongoing reviews of your work.
  • An annual review of your overall performance.

Moving up a level

You can apply to move up a level if you:

  • Have been at your level for at least 1 year.
  • Have:
    • 20 consents in Selwyn District (design partner), or
    • 20 remote inspections in Selwyn District (construction partner).
  • Keep meeting all programme requirements and expectations.

To apply for a change in level, use our partner application form [DOCX, 144 KB].

Moving down a level (or removal)

If reviews show serious issues, depending on the extent of the issue(s):

  • you may be moved down a level, or
  • you may be suspended or removed.

If this happens (design partners):

  • You’ll be checked more often (1 in 5 projects) to monitor progress.
  • Once performance improves, checks may reduce again to 1 in 10 projects.

How we monitor

Design partners

  • Review a sample of applications (about 1 in 10).
  • At least one application reviewed every 6 months.
  • A yearly review.

Construction partners

  • Check remote inspection information and documents during the inspection review and yearly review.
  • Visit sites if needed (eg where something being assessed remotely is unclear – this may incur additional cost).

Suspension or removal

You may be suspended for a while if you don’t meet the requirements.

At the end of the suspension period, we’ll review your performance:

  • Good performance: suspension is removed.
  • No improvement: you may be removed from the programme.
  • You can apply again to become a parter when you’re confident you consistently meet the partner requirements.

What we consider as part of this process:

Designer

Company

A serious building industry practitioner complaint or several minor complaints are identified within a 12 month period on our building industry practitioner complaints register

There is LBP board disciplinary action, including suspension and non-payment of fees

Technical reviews carried out on the partner by us identify concerns about the legislative knowledge of the professional

There are frequent inspections failures due to incomplete or non-compliant works or site information

n/a