From late October until September 2026, Fulton Hogan will be carrying out Stage One of the Lincoln Town Centre Upgrade.
August 2026 works
Gerald Street works to install pedestrian ramps - 24 August to 4 September 2026
From Monday 24 August to Friday 4 September, work will take place on Gerald Street to install two raised ramps at pedestrian crossings as part of the Lincoln Town Centre project. These improvements mark another key milestone as Stage 1 nears completion.
Traffic impacts:
- Temporary traffic lights will be in place during construction.
- Robert Street and William Street will operate as entry only for the duration of the works.
- A temporary 30km/h speed limit will be in place through the work area.
- Footpath and cycle access will be maintained.
- Access to properties and businesses will remain available.
Work will generally be undertaken between 7am and 7pm, Monday to Friday, with Saturday or night works if required. Construction timing may be affected by weather conditions.
Thank you for your patience while these important safety improvements are completed. Please take care when travelling through the area and follow all temporary traffic management signage.
For enquiries, contact Fulton Hogan on 0800 7623 34 (0800 ROAD FH) Monday to Friday, 8.00am - 5.00pm or email cant.info@fultonhogan.com

July 2026 works
Robert Street and William Street temporary road closures at intersection with Gerald Street - 27 July to 3 August 2026
From Monday 27 July, we’ll be working on Robert Street and on William Street, at the intersection with Gerald Street. During these works, we will be constructing new concrete ramps. Each ramp requires a 72-hour curing period to achieve sufficient strength before being reopened to traffic. Works are weather dependent and may be delayed if required.
- The road closures will be in place from Monday 27 July and we expect the work to take about a week to complete.
- There will be no access onto Gerald Street from Robert Street and vice versa during this time. Please use the detour routes via South Belt/Maurice Street.
- William Street will also be closed at the intersection of Gerald Street for this same period, please use the detour routes via North Belt/Lyttelton Street.
Our friendly staff on site can assist with any queries. Footpath access around our work site will be maintained. A temporary 30km/h speed limit will be in place where we are working so we can keep our workers safe. Please drive with care when travelling through the site, allow extra time and pay attention to the signage and changes to the road layout.
General information:
- Access to properties and businesses will be maintained.
- The majority of the work will be carried out from Monday to Friday between 7:00am and 7:00pm, and on Saturdays and at night if needed.
- The timing of the work and certain activities will depend on the weather and the condition of the roads. We will provide updates if there are changes to the planned works.
- Measures will be in place to minimise noise, dust and vibration levels.
- There will be construction noise as the work is completed but this will be kept to a minimum.
Thank you for your patience while we complete these improvements.
For enquiries, contact Fulton Hogan on 0800 7623 34 (0800 ROAD FH) Monday to Friday, 8.00am - 5.00pm or email cant.info@fultonhogan.com

Gerald Street and Kildare Terrace overnight works - 12 July to 17 July 2026
We’ll be carrying out overnight paving works between 7 pm and 6 am on Sunday 12 July until 17 July along the shop frontages between Hammer Hardware and I Sushi. This work is expected to take around a week to complete. This includes removing sections of the existing surface, preparing the area, and laying new pavers. A small section of kerb and channel and footpath resurfacing will also be completed at the Kildare Terrace and Gerald Street intersection.
The work will take place at night when many of the businesses will be closed to minimise the disruption for them during the day.
- There will be some noise from machinery, trucks and work crews and temporary lighting will be used.
- Our team will do their best to keep disruption to a minimum.
- Pedestrian access will be restricted in some areas during the works.
- Please follow directions from onsite staff and observe all signage.
Thank you for your patience while we complete these improvements.
For enquiries, contact Fulton Hogan on 0800 7623 34 (0800 ROAD FH) Monday to Friday, 8.00am - 5.00pm or email cant.info@fultonhogan.com

Maurice Street and West Belt - temporary closures now extended to 17 July 2026
As part of Stage One of the Lincoln Town Centre project, we’ll be completing road reconstruction works at the intersections of Maurice Street and West Belt with Gerald Street.
Work began on Monday 8 June 2026 and is now expected to be complete by 17 July.
Temporary road closures will be in place during this period:
- Maurice Street at the Gerald Street intersection will be closed
- West Belt at the Gerald Street intersection will be closed
- Detours will be in place via South Belt and Robert Street
- West Belt (north) will temporarily be one way
- Lyttelton Street will temporarily be one way
Footpath access will remain open, and access to properties, businesses and the public car parks will be maintained.
A temporary 30km/h speed limit will apply, please follow all signage and allow extra travel time.
General information
- Work hours are typically Monday to Friday, 7.00am–7.00pm, with some weekend or night works if needed
- Timing may change depending on weather and site conditions
- Efforts will be made to minimise noise, dust and disruption
For enquiries, contact Fulton Hogan on 0800 7623 34 (0800 ROAD FH) Monday to Friday, 8.00am - 5.00pm or email cant.info@fultonhogan.com